Winch Strap Synthetic Rope for Electric Winches

  • Model NO.: for all winches
  • Winch Capacity 1500lbs: Synthetic Rope Size 4mmx7.6m
  • Winch Capacity 3000lbs: Synthetic Rope Size 4.8mmx15.2m
  • Winch Capacity 5000lbs: Synthetic Rope Size 6mmx9.2m
  • Winch Capacity 9000lbs: Synthetic Rope Size 8mmx26m
  • Winch Capacity 17000lbs: Synthetic Rope Size 10mmx28m
  • Origin: China
  • Type: Cargo Winch Strap
  • Winch Capacity 2500lbs: Synthetic Rope Size 4.8mmx12.2m
  • Winch Capacity 3500lbs: Synthetic Rope Size 5.5mmx13.75m
  • Winch Capacity 6000lbs: Synthetic Rope Size 7.2mmx24m
  • Winch Capacity 12000lbs: Synthetic Rope Size 9mmx26m
  • Trademark: oem
Winch synthetic rope-High Performance

winch capacity(lbs) synthetic rope size
1500 4mmx7.6m
2500 4.8mmx12.2m
3000 4.8mmx15.2m
3500 5.5mmx13.75m
5000 6mmx9.2m
6000 7.2mmx24m
9000 8mmx26m
12000 9mmx26m
17000 10mmx28m

We have many years experience in manufacturing high quality engine, electric winch, hand winch, etc. We have achieved good performance during the past years, sincerely welcome businessmen overseas to establish a long-term cooperation to create a beautiful tomorrow!

Double Girder Overhead Crane With Winch

1. There are three types of double beam bridge crane operating room: separate type, closed type and thermal insulation.

2. The platform entrance of double beam bridge Crane Cab is divided into three types: side, end and top.

3. H is the increased height of Crane Buffer.

4. Double beam bridge crane is divided into indoor and indoor cranes. When ordering, the highest and lowest temperature of the working environment and the type of power supply and other technical requirements shall be indicated.

5. Overload limiter, large screen display and various protective devices are added to further increase the safety during use.

6. Double beam Overhead Crane generally adopts air operation mode, which is different from other ground operated cranes. Air operation means that there is a separate small operation room under the crane, while ground operation means that the operator carries the remote control

Double Girder Overhead Crane With Winch,Double Girder Overhead Crane,Double Girder Overhead Cranes

EUROCRANE GLOBAL , https://www.overhead-crane.com