What should pay attention to in the smart parking system in the sense of cutting coil?
Mesh Cable Tray,Wire Mesh Cable Tray,Mesh Type Cable Tray,Ss Wire Mesh Cable Tray Shenzhou City Shengsen Metal Products Co., Ltd. , https://www.xsswiremesh.com
Before cutting the ground coil, we must first ensure that there is not a small amount of metal within about 50 cm of the perimeter, such as manhole cover, rain gutter cover, etc.; secondly, do not have high voltage lines within 1 meter of the cutting line; If multiple ground coils are cut, the gap between the coil and the coil must be greater than 2 meters, otherwise it will interfere with each other. When we construct, make sure that the depth and width of the coil slot should be the same on average, try to avoid the situation where the depth and width of the coil are the same as each other. After the end of the cutting, ensure that there is no debris in the coil slot, especially if there is no hard object, in the proximity. When you are on a safety island, avoid leaving the leads exposed on the road.
In order to prevent the wires in the slots from being cut by hard corners, it is best to lay some fine sand in the grooves when installing the coils. The wires in the grooves should be as stress-free as possible. At the bottom of the trough, after laying the wire in the trough, in order to avoid the coil skin from being melted at high temperature, we try to cover the laid coil with a layer of fine sand. Finally, we use a molten asphalt to repeatedly pour until it is flush with the road surface. , so that we have completed the cutting of the ground coil.
Although the inductive coil is a small part of the parking lot, it must be looked for by the regular parking system manufacturer for cutting. It not only concerns the normal operation of the parking lot, but also affects the use of the parking lot system. life.