Phoenix, Nevada, USA (Phoneix) Gold Mine

In March 2006 the first gold shipment Sinotrans. Design production capacity: processing ore volume of 31,750 tons / day. It is expected to produce 350,000 ounces/year of gold and 9000 to 11250 tons/year of copper . Mine open manner in mining, mineral flotation and hydrometallurgical methods. The ore reserves/resources amounted to 314,488,100 tons, the average grade: gold 0.98 g / ton, copper 0.15%, converted to a rough gold reserves of 8.95 million ounces, copper reserves of 420,000 tons. Newmont Mining owns 100% of the shares. (Source: Resource Network)

Resistor Forming Machine

Jumper Wire Forming Machine

Jumper Wire Forming Machine, Wire Stripping machine, Wire cutting machine

SINGSUN ELECTRONIC SCIENCE & TECH CO.,LTD , https://www.szsingsunautomatic.com