Sinochem Second Construction Group Hospital Inpatient Complex Construction Project
Progress stage: Environmental impact assessment construction period: 2011-2012 Major equipment: cranes, firefighting facilities, security facilities, water supply and drainage facilities, electrical facilities, building facilities, etc. Project Profile: The project is located at No. 26 Yijing Street, Jinyuan District, Taiyuan City, covering an area of ​​5,624 square meters and a total construction area of ​​28,557 square meters. The new hospitalized integrated main building and supporting building plans to dismantle the existing internal and surgical wards, radiology houses, and canteens as expansion bases. The construction content includes: Inpatient comprehensive building main building, inpatient comprehensive building annex, underground parking lot, power supply system and other ancillary facilities. The main building of the hospitalization complex is actually the fifteen floors above the ground and the first floor of the hospital. The building for the hospitalization complex is designed as a basement and six floors above the ground. Add 300 beds to the bed. Construction Unit: Sinochem Second Construction Group Hospital Postal address: 26 Yijing Street, Jinyuan District, Taiyuan City Zip: 030012 Design Unit: Shaanxi Huaruixin Environmental Protection Technology Co., Ltd. (EIA) Electrical Cabinet Cold Bending Electrical Cabinet Cold Bending,Cold-Formed C-Beam Material,Sixteen Fold Profile Structure,Cross-Section Of A C-Profile Huai'an Senyu Intelligent Technology Co., LTD , https://www.jshasyzn.com
The total investment of the project is 97.6 billion yuan
phone
Postal address: No. 1, Qianfeng South Road, Taiyuan City Zip: 030024
Tel: 0351--6195357