Shandong Nuclear Power Unit 1 circulating water pump unit delivered on time
Installation and precautions of track connecting rod oil seal Wear ring for excavator,For excavator track,For excavator accessories Safe Seal Technology Co., Ltd. , https://www.aprseal.com
The circulating water pump group is manufactured by Ebara Corporation of Japan. Each AP1000 nuclear power unit is equipped with three circulating water pump groups. Its technical performance requires a rated flow of 21.67 cubic meters per second, a rated head of 12.5 meters of water, and a fixed pump type. Rotary speed, rotor drawable, fixed vane, vertical double support wet well slant flow pump.
The installation steps for the track link oil seal are as follows:
1. Cleaning: Clean the connecting parts to ensure that the surface is flat, clean, and free of grease and dirt.
2. Oil application: Apply a layer of lubricating oil to the connecting parts for better installation.
3. Installation: Gently push the oil seal into the connection area to ensure that the lip of the oil seal is not damaged.
4. Positioning: After positioning the oil seal, press it with your fingers to ensure it is in the correct position.
5. Inspection: Check if the oil seal is installed correctly and ensure that the lip is not damaged.
The precautions are as follows:
Before installation, check if the oil seal is damaged. If the oil seal is damaged, replace it with a new one.
Before installation, ensure that the surface of the connecting parts is flat, clean, and free of grease and dirt.
3. When installing the oil seal, gently push in to avoid damaging the lip of the oil seal.
4. After installation, check whether the oil seal is installed correctly to ensure that the lip is not damaged.
5. During use, the condition of the oil seal should be regularly checked. If any damage or wear is found, the oil seal should be replaced in a timely manner.